Validate your building's maintenance plan in South Australia — Quarter

In New Zealand? Visit quarter.nz for body corporates.

The plan is what makes the levy honest.

Every building is spending down an asset. The roof, the lifts, the membranes, the paint and the plant all have a service life and a replacement cost, and the only question is whether the strata corporation is collecting for them or deferring them. A maintenance plan is how you tell. A plan that is stale, generic or never reviewed does not tell you anything — it just makes the building feel prepared while the gap grows.

Validate your building's maintenance plan in South Australia

South Australia requires a sinking fund, but — unlike most jurisdictions — it does not require a ten-year plan behind it. That leaves the adequacy of the fund entirely to the corporation's own judgement, and it is why South Australian buildings are disproportionately likely to meet a large repair with a special levy. Building a plan you are not required to build is the single highest-value thing an SA corporation can do.

Governed by the Strata Titles Act 1988 and Community Titles Act 1996, administered by Consumer and Business Services.

At a glance — SA

Required
A sinking fund is mandatory. A 10-year plan behind it is not required by the legislation.
Larger schemes
Schemes over 100 units, or raising substantial levies annually, are expected to plan and fund their own capital works.
Consequence
With no statutory plan, nothing external prompts a review — the corporation has to prompt itself.
Which Act
Strata Titles Act 1988 or Community Titles Act 1996.
Best practice
Commission a 10-year forecast voluntarily and resolve to review it on a fixed cycle.

How to do it in South Australia.

  1. 1

    Find out what the sinking fund actually holds

    And when anybody last asked whether it was enough.

    In Quarter: Upload the plan you already have and Quarter reads it into a costed schedule of items, lifecycles and due years. From there it projects the fund thirty years out and tells you the annual contribution that actually funds it.

    Find out what the sinking fund actually holds in Quarter
  2. 2

    Commission a 10-year forecast even though you need not

    From an inspection. This is the decision that separates SA corporations that get surprised from those that do not.

  3. 3

    Resolve a review cycle at a general meeting

    Every three to five years, recorded, so it survives a change of committee.

    In Quarter: Build the motion from the quotes and the budget, send the notice to every owner off the ownership register on the statutory clock, and record the vote as it is cast — a decision carries its majority automatically and emails the outcome to whoever raised it.

    Resolve a review cycle at a general meeting in Quarter
  4. 4

    Compare the forecast contribution to your levies

    And decide, deliberately, whether to close the gap or accept it.

    In Quarter: The plan's required contribution feeds the budget, and approving the budget raises the levies from it — so what owners pay is derived from the plan rather than from last year's number plus a bit.

    Compare the forecast contribution to your levies in Quarter
  5. 5

    Put the position in the AGM papers each year

    What the fund holds, what the forecast says it needs.

    In Quarter: Book the year's meetings once — the AGM and the committee meetings around it — and Quarter carries the notice periods, the agendas and the invitations from there. The insurance renewal and the plan review sit on the same calendar, so the year is visible rather than remembered.

    Put the position in the AGM papers each year in Quarter
  6. 6

    Move the levies

    Gradually is far easier to pass than a special levy is.

Where SA buildings get caught.

Relying on the absence of a requirement

Not being required to plan is not the same as not needing to.

A fund balance nobody benchmarks

Without a forecast, 'we have money in the sinking fund' means nothing.

Special levies as the default funding mechanism

It is the most expensive and least equitable way to fund predictable work.

Why a plan on file is not the same as a plan that works

Most buildings have something. Far fewer have a plan that reflects the building as it actually is, costed at what work actually costs now, and matched to what the levies actually raise.

An old plan understates everything
Construction costs rose sharply from 2020. A plan built on pre-2020 numbers is not conservative — it is wrong, by a compounding margin.
A generic plan describes a building you do not own
Plans produced from a template rather than an inspection miss the things that are specific to your building, which are exactly the expensive things.
A plan nobody sets levies against changes nothing
The value is not the document. It is the contribution rate it implies, applied.
The special levy is the bill for not having one
Deferred maintenance does not go away. It arrives as a lump sum, usually at the worst time for the owners least able to pay it.

How Quarter keeps the plan honest

A plan is only as good as the maintenance record behind it and the budget in front of it. Quarter connects the three.

The plan and the real work in one place

What the plan said would happen, and what actually happened. The gap between them is the most useful number a committee has.

Levies set against the plan

Budget from the plan's contribution rate rather than from last year's figure plus a bit.

Review dates that arrive on time

Where a review is required, it is tracked as an obligation with a date, not a good intention.

Every asset with a history

Repairs, quotes, invoices and warranties attached to the thing they were for, so the next plan review starts from evidence.

Owners can see the position

What the fund holds, what the plan says it needs, and the difference — visible, so a levy increase is a conversation rather than an ambush.

Questions we get asked.

How long should the plan cover?
It depends where you are, and the answer ranges from ten years to thirty. The more useful test is whether it covers the building's longest-lived expensive components. A ten-year plan for a building with a lift due for replacement in year twelve is a plan with the worst news left out.
Who should prepare it?
A quantity surveyor or a building consultant who inspects the building. The distinguishing feature of a good plan is that somebody walked the site. Desktop plans built from the plan drawings and a cost table are cheaper and worth roughly what they cost.
How much should the fund hold?
There is no universal number, and any rule of thumb quoted as a percentage of anything should be treated with suspicion. The right amount is whatever the plan says, given your building's components, their condition and their remaining life.
What if we are already behind?
Then you find out by how much, and over what period you can catch up. A building that knows it is behind and is closing the gap on a schedule is in a far better position than one that has not looked — including at sale, when a buyer's solicitor asks.

Where this comes from

General information about South Australia, not legal or financial advice for your building. Legislation is amended and grant programmes open and close — check the current position with Consumer and Business Services or the administering body before you act on anything here.

Validate your maintenance plan — elsewhere

Other things to get done in SA

Get this one off the list.

Tell us about your building in South Australia and we will show you exactly how Quarter would run it.